How to make basic home repair like re-leveling a poured floor

Many homeowners can save a lot of money by doing the job themselves. All they need is a little guidance in the right areas.

Take a sloped floor for example. You can look at the ground like a still stationary object, but in reality, it is usually suspended in the air at the top of the posts and beams. The scope of this article is not able to cover a poured concrete floor. It's an entirely different matter.

Now back to the hollow wood floor. Under this is a crawl space or maybe a basement and you have to determine where the floor is sunk to be able to find the support member that needs to be repaired. It's quite easy to do with a level.

Go to the room with the greatest inclination in the ground and set the level on it to see which way the floor falls. Now, go around the room and set the level in different directions to find the lowest point. Sometimes the lowest point is in a different room, but it indicates where the repair is to take place.

Some of the causes of the sinking are rotten wooden elements that support the ground, the concrete pillar or stone sank It is possible that the ground under the jetty is disturbed during excavation and that it is not possible. it is not compacted before placing the pier or that there has been a movement of the earth down and that an area of ​​the house is poured.

set so do not despair. There are simple, easy-to-apply steps you can follow to do the job yourself.

The main tools you will need are

  • Jacks of 25 tonnes or more (you should have two) You can get away with 12-tonne jacks but it's harder to pump them.) Or screw jacks
  • 4X6 to go under the beam and down to the concrete jetty
  • Some 2X4 pieces to nail the studs to the beams when they are made or metal straps if you want.
  • A Hammer,
  • A Hammer, [19659009] 4 pieces of two feet of 2X6
  • 2 pieces of plywood of 1 "X1" 3/4 "for the suitcases to stand on
  • A good 4 "or longer level
  • clean plastic sheet for laying under the house

Now that you have all the tools ready and you have located the part of the house that is low. It's time to go to work. You will want to be near the post when you lift the beam. In this way, you only lift the lower end of the beam and do not try to lift the entire middle beam.

Generally, two beams meet on a pole and you will need two jacks to lift each beam safely. . Once. To properly position the cylinders, you must first place the 2X6 sides side by side (2 of them) and then you lay the 3/4 "plywood in the middle of them, then the cylinder Pass on top of this one.Make sure that the platform you are building is level.The jack should be directed up and down to work safely.

The last thing you want is a jack leaning with a bunch of weight sitting on Work safe and you'll have a good time to repair the poured floor.

Start now to raise the beam or beams If two beam ends are lifted, they must go up to same level and now go periodically check the floor to make sure you upgrade it, you may hear click and squeak noises, it's natural, so do not worry.

Si you have to lift the floor more from 1/2 to 1 "you can have cracks in the walls and they are just cosmetic, so they can be repaired without too much trouble ty. Doors may also not fit their openings if you have to lift a wall with a door in it.

Once you have the ground level, give it a pump or two more on the jack and cut yourself a new pole for the new gap from the beam to the concrete pier. Place a piece of tarred paper on top of the concrete jetty, then the new post on the tarred paper so that the wood can not touch the concrete. This will prevent the wood from rotting. The wood must also be treated by pressure.

If there are two beams, make sure the joint lands in the center of the new post and then lower the beams to the post. Now take the 2X4 pieces and place them against the beam and on each side of the post and nail them together.

You have now finished and can pick up all your tools. It's the moment you experience the pride of doing the work yourself.

If you lift beams in a basement, you would use jacks for safety and ease of use. You still want to build the wooden base so that the jacks can stand up to avoid cracking the concrete floor.



Source by Glenn Gehrke